|
MODULE TITLE
|
LEARNING MATERIALS
|
CONTENT
|
|
Oil and Gas Separation
|
|
|
2 Workbooks comprising 6 sections
Study time needed
25 hours
|
Headers and Manifolds
Theory of Separation
Construction of Separators
Control of Separators
Separator Safety Systems
Operation of Separators
|
|
Gas Dehydration
|
|
|
1 Workbook comprising 4 sections
Study time needed
20 hours
|
Water in Natural Gas
Auto Refrigeration Processes
Solid Desiccant Dehydration
Liquid Desiccant Dehydration
|
|
Petroleum Gas Compression
|
|
|
4 Units each in a separate Workbook
Study time needed
40 hours
|
Unit 1 – AN OVERVIEW
Compressor Applications
Basic Principles of Compression
Types of Compressor
Unit 2 – RECIPROCATING COMPRESSORS
Design and Construction
Auxiliary Systems
Operation of Reciprocating Compressors
Unit 3 – CENTRIFUGAL COMPRESSORS
Design and Construction
Auxiliary Systems
Operation of Centrifugal Compressors
Unit 4 – OTHER TYPES OF COMPRESSOR
Positive Displacement Compressors
Continuous Flow Compressors
|
|
Natural Gas Liquids Recovery
|
|
|
1 Workbook comprising 4 sections
Study time needed
20 hours
|
The Theory of NGL Recovery
NGL Recovery using Compression and Cooling
NGL Recovery by Refrigeration
NGL Recovery using an Absorption Process
|
|
Oil Pumping and Metering
|
|
|
1 Workbook comprising 5 sections
Study time needed
25 hours
|
Centrifugal Pumps : terms and concepts
Construction and Operation of Centrifugal Pumps
Oil Metering and Sampling
Pig Launching Facilities
Operation of a Typical Oil Pumping and Metering System
|
|
Injection Water Treatment
|
|
|
1 Workbook comprising 4 sections
Study time needed
25 hours
|
Reasons for Water Injection
Reasons for Treating Injection Water
Sea Water Treatment Equipment
Operation of a Typical Water Injection System
|
| Produced Water Treatment |
|
|
1 Workbook comprising 4 sections
Study time needed
20 hours
|
Problems Associated with Produced Water
Basics of Produced Water Treatment
Produced Water Cleaning Equipment
A Typical Produced Water System
|
| Gas Flow Measurement |
|
|
1 Workbook comprising 4 sections
Study time needed
20 hours
|
Gas Flow Measurement
Applications and Gas Physics
Fluid Flow Principles
Measurement Devices and Methods
Orifice Plate Metering Equipment
|
| Process Flow & P&ID's |
|
|
2 Workbooks comprising 7 sections
Study time needed
20 hours
|
Plot Plans and Elevation Drawings
Process Flow Diagrams
Piping and Instrument Diagrams
Figures, Illustrations and Symbols
|
| Oil Treatment (Dehydration) |
|
|
1 Workbook comprising 4 sections
Study time needed
20 hours
|
Emulsions – Their Nature and Occurrence
Principles of Emulsion Treating
Dehydration Systems and Equipment
A Typical Dehydration System
|